Scrum 事件与仪式 · PMP 练习题解析

敏捷与混合实践 中等 Process 过程域 题号 PMP202611-427

题目

某 Scrum 团队已完成 20 个冲刺。Scrum Master 发现回顾会流于例行:每次都讨论同样两三个事项,缺乏真正的反思。应该怎么做?
A Scrum team has completed 20 sprints. The Scrum Master notices that retrospectives have become routine: the same two or three items are discussed every time with little genuine reflection. What should the Scrum Master do?

选项

  1. A.Vary the retrospective format and questions, use different techniques (starfish, 4Ls, sailboat, timeline) to break routine, surface new perspectives and re-engage the team in genuine reflection.
  2. B.Ask leadership to mandate that retrospective action items are implemented to create accountability.
  3. C.Replace retrospectives with a quarterly improvement meeting to reduce the frequency burden.
  4. D.Reduce retrospective frequency: teams reach a maturity plateau where retrospectives add less value.
正确答案:A

解析

解析:A 正确。长期运行的团队出现“回顾疲劳”很常见,解法是变换形式:新方法能打开不同思路,暴露老形式总是漏掉的问题。回顾会的价值在于真实反思,一旦被例行化消磨,Scrum Master 就必须刷新做法。降低频率(D、C)等于接受这种退化;外部强制(B)只带来服从而非真投入,与回顾会的精神相反。 Rationale:A is correct. Retrospective fatigue is real and common in long-running teams. The solution is format variation: new techniques unlock different thinking and surface issues that the same format consistently misses. The retrospective's value is in genuine reflection; when that atrophies through routine, the Scrum Master must refresh the approach. Reducing frequency (D, C) accepts the atrophy. External mandate (B) creates compliance without genuine engagement, the opposite of the retrospective's spirit.