待办列表与优先级 · PMP 练习题解析

敏捷与混合实践 中等 Process 过程域 题号 PMP202611-295

题目

产品负责人想向已经排满的产品待办加入 20 个新用户故事,当前待办有 150 个故事,团队在两周冲刺中的速率为每冲刺 25 点。产品负责人应该怎么做?
A Product Owner wants to add 20 new user stories to an already-full product backlog. The backlog currently has 150 stories. The team's velocity is 25 per sprint with 2-week sprints. What should the PO do?

选项

  1. A.Add all 20 stories to the top of the backlog since they are new priorities.
  2. B.Add the 20 stories, but reprioritise the entire backlog: higher-priority new stories may displace lower-priority existing ones, and lower-value items may need to be removed.
  3. C.Reject the new stories since the backlog is already too large.
  4. D.Add the stories to the bottom of the backlog to be addressed after current items are delivered.
正确答案:B

解析

解析:B 正确。产品待办的梳理是产品负责人持续的责任。新事项可以随时加入,但待办必须保持有优先级、可管理。加入故事并重排(必要时删除低价值事项),才能让待办健康聚焦。一律置顶(A)忽略相对优先级;拒绝新故事(C)限制了产品负责人的产品权限;一律排到末尾(D)则回避了优先级决策。 Rationale:B is correct. Product backlog management is an ongoing PO responsibility. New items can be added at any time, but the backlog must remain prioritised and manageable. Adding stories and reprioritising (potentially removing low-value items) keeps the backlog healthy and focused. Adding automatically to the top (A) ignores relative priority. Rejecting new stories (C) limits the PO's authority over the product. Auto-appending to the bottom (D) defers prioritisation decisions.

同考点练习题