题目
一位来自不同文化背景的成员在小组会议中很少发言,但其书面想法很有价值。最好的做法是什么?
A team member from a different cultural background rarely speaks in group meetings, though their written ideas are strong. What is the best action?
选项
- A.Ask them to speak more in every meeting.
- B.Accept that they will not contribute verbally.
- C.Create safe ways to contribute, such as one-to-one check-ins, written input and round-robin discussion.
- D.Give their work to someone more vocal.
解析
解析:包容性领导要适应不同风格。多种输入渠道能让每位成员充分发挥;施压或排斥则会浪费好想法。
Rationale:Inclusive leadership adapts to different styles. Several channels for input help every member contribute fully; pressure or exclusion wastes good ideas.