某原型建造项目分三阶段:设计、制造零件、装配。目前第一阶段即将结束。该阶段交付物应当如何处理?
A three-phase project to build a prototype is underway: design, manufacturing parts, then assembly. The project is now at the end of the first phase. What should be done with the phase's deliverables?
选项
- A.Verified by the testing team for quality compliance
- B.Transferred to the production team
- C.Transitioned to the project management office (PMO)
- D.Handed over to the manufacturing team
解析
解析:阶段收尾的一项重要输出,是把成果移交给后续负责运营或支撑的团队。设计成果应移交制造团队,因为第二阶段由他们负责。
Rationale:Closing a phase includes transitioning the product, service or result to the group that will operate or support it. Design ownership transfers to the manufacturing team, which runs the second phase.