风险应对策略选择 · PMP 练习题解析

风险管理 中等 Process 过程域 题号 PMP202611-473

题目

风险规避意味着:
Risk avoidance means:

选项

  1. A.Ignoring the risk
  2. B.Eliminating the threat, e.g., by removing the cause
  3. C.Buying insurance
  4. D.Accepting the risk
正确答案:B

解析

解析:规避是彻底消除威胁,比如改方案让风险不可能发生;买保险属转移,接受则是承受。 Rationale:Avoidance eliminates the threat entirely — for example, by changing the plan so the risk cannot occur.