某敏捷团队成员向 Scrum Master 反映:自己的意见从不被听取,两名资深成员主导了所有技术讨论。Scrum Master 应该怎么做?
A team member in an agile team tells the Scrum Master they feel their ideas are never listened to and that two senior members dominate all technical discussions. What should the Scrum Master do?
选项
- A.Acknowledge the concern, observe team dynamics in upcoming meetings, and actively facilitate discussions to create space for all voices: particularly through structured techniques like round-robins or silent brainstorming.
- B.Ask the two senior members to participate less in discussions.
- C.Address the issue in the next retrospective so the whole team can hear the concern.
- D.Tell the team member to speak up more assertively during meetings.
解析
解析:A 正确。心理安全与包容参与是 Scrum Master 的职责。先观察,再用结构化引导技术解决系统性问题,且不点名任何个人。轮流发言、静默头脑风暴、“先写后说”等做法能自然均衡贡献。让成员自己更强势(D)是责怪受害者;限制资深成员(B)带有惩罚性;在回顾会公开(C)会暴露私下求助的人。
Rationale:A is correct. Psychological safety and inclusive participation are Scrum Master responsibilities. Observation followed by structured facilitation techniques addresses the systemic issue without singling anyone out. Round-robins, silent brainstorming and "everyone writes before anyone speaks" techniques naturally equalise contribution. Telling the member to be assertive (D) blames the victim. Restricting senior members (B) is punitive. Raising it in a retrospective (C) exposes the team member who shared in confidence.