题目
某开发团队交付的功能一贯符合其自定的完成定义,但在冲刺评审时被客户否决,客户称这些功能“感觉不对”。最可能的原因与解决方案是什么?
A development team consistently delivers features that pass their own Definition of Done but are rejected by the customer during sprint review, saying the features "don't feel right." What is the most likely root cause and solution?
选项
- A.The team needs more technical training to improve the quality of their work.
- B.The customer's expectations are unclear, the Product Owner should work with the customer to define clearer acceptance criteria for each story before the sprint begins.
- C.The Definition of Done is too broad: tighten acceptance criteria to be more specific.
- D.Sprint reviews should be eliminated and replaced with asynchronous customer feedback.
解析
解析:B 正确。当功能技术上过关却不符合客户期望时,问题几乎总是出在冲刺前需求不够清晰,而非技术质量。产品负责人的职责是在冲刺计划前把客户需求转化为清晰、可测试的验收标准。验收标准含糊,就会产出技术正确但不令人满意的功能。完成定义(C)管的是技术完整性,不是客户满意度;培训(A)解决不了需求不清;取消评审(D)会砍掉关键反馈闭环。
Rationale:B is correct. When features are technically correct but don't meet customer expectations, the issue is almost always in requirement clarity before the sprint, not technical quality. The PO's role is to translate customer needs into clear, testable acceptance criteria before sprint planning. Vague acceptance criteria produce technically correct but unsatisfying features. The DoD (C) governs technical completeness, not customer satisfaction. Training (A) doesn't address unclear requirements. Eliminating sprint review (D) removes the key feedback loop.