题目

某团队在考虑用 Scrum 还是看板。其工作是源源不断的支持请求,没有明确结束日期,规模不一、到达时间不可预测。哪种更合适?
A team is considering whether to use Scrum or Kanban. Their work consists of a continuous stream of support requests with no defined end date, varying sizes and unpredictable arrival times. Which is more appropriate?

选项

  1. A.Kanban: its flow-based, pull system and WIP limits are ideal for continuous, unpredictable work streams without fixed sprints or planning ceremonies.
  2. B.Scrum: sprints provide the structure needed to manage unpredictable work.
  3. C.Neither: support work should use a traditional ticketing system without agile.
  4. D.Scrum with 1-week sprints to keep up with the rapid request volume.
正确答案:A

解析

解析:A 正确。看板专为持续流动型工作设计:不设固定冲刺,按产能拉动事项,用在制品限额防止过载,并以周期时间为核心指标。Scrum 的冲刺边界制造了人为的起止循环,不适配不可预测的支持类工作流。缩短冲刺(D)只能减弱而不能消除错配;传统工单(C)放弃了看板的流动优化收益。 Rationale:A is correct. Kanban is specifically designed for continuous flow work: no fixed sprints, items pulled as capacity allows, WIP limits to prevent overload, and cycle time as the key metric. Scrum's sprint boundaries create artificial start/end cycles that don't fit unpredictable support streams well. Short sprints (D) reduce but don't eliminate the mismatch. Traditional ticketing (C) misses the flow optimisation benefits of Kanban.